Solar power plant Aleva doo Novi Kneževac

solarna-elektrana-aleva

Kodar Energomontaža built and commissioned a new solar power plant for the needs of the company Aleva doo Novi Kneževac.

The total installed power of the built power plant is: 240 kWp.

In the period of less than three months of operation of this power plant, savings of 37.7 tons of coal were achieved, CO2 gas emissions were reduced by 94 tons, and 5,187 trees were not cut down.

By building solar power plants, our society is moving in the direction of creating a sustainable and green energy sector, which implies a reduction in sulfur dioxide and carbon dioxide emissions, and thus cleaner air and a healthy environment.

Client: Terra Solar doo

Status: Completed May 2022