Kodar has completed work on a very important project. Construction of 400 kV transmission line, TS Kragujevac 2 – TS Kraljevo 3. The construction of 400 kV transmission line from substation TS Kragujevac 2 to substation TS Kraljevo 3, total length of 60 kilometers, as well as reconstruction of substation TS Kraljevo 3 and raising from 220 kV to 400…
Within the shopping center “Gallery”, and for the needs of powering part of the promising consumption of Belgrade on water, through the EPC contract, we built a modern transformer station that will enable the development of this part of the city of Belgrade. This project is specific because we have designed and built the first urban 110 / 10kV substation,…
Leave a Reply